Metrology
Agree on methods, test conditions and reporting for critical characteristics.
Explore MetrologySUPERIOR OPTICS / CAPABILITIES
An optical inspection procedure defines what to check, when to check it, and what evidence is needed before releasing a lens or lot. Agree on the drawing revision, acceptance limits, sampling plan and required records before prototype approval or production release.
Start with incoming material inspection, then use in-process optical inspection to check critical features before later operations make them harder to verify. Add coating and assembly checks where applicable, and use final lens inspection to confirm the agreed release requirements.
Verify material identity, lot records and incoming condition.
Check designated dimensions, surface form and appearance.
Where applicable, review spectral results and witness sample records when specified.
Where applicable, check alignment, focus or imaging performance as specified.
Review results against acceptance limits and confirm release status.
Example inspection flow. Checkpoints and records depend on the product, drawing and agreed inspection plan.
Share the current drawing, product configuration, expected quantities and critical acceptance limits. Define which checks apply to first samples and production lots, then agree on the sampling plan, measurement conditions and records needed at each stage.
| Review item | What to share | Review output |
|---|---|---|
| Incoming material | Drawing revision, component identifiers and incoming criteria | Incoming check record and lot identification |
| Assembly checkpoints | Critical operations, limits and responsible process owner | In-process results or documented deviations |
| Final acceptance | Inspection method, sampling rules, and pass/fail limits | Final report or release record as agreed |
| Nonconformance | Notification, segregation, rework and concession rules | Disposition and retest or approval record |
When the drawing specifies surface imperfections, identify the surface, inspection area and applicable limit. Confirm the evaluation method and viewing conditions before inspection so both teams apply the same criteria when assessing the part.
An optical inspection report should connect each result to the drawing revision, part or lot, and agreed acceptance limit. Record the inspection outcome and any unresolved deviations so the reviewer can see why the lot was released or held.
Record the part number, drawing revision, lot or serial number, and inspected quantity. Link each result to the sample measured and distinguish first sample approval from routine production inspection.
List the measured value or attach the relevant plot alongside the acceptance limit. Include the method and test conditions needed to interpret the result, and identify which checks were performed on samples.
Record whether the lot was released, held or referred for review. Identify any deviation, retest result or authorized concession, and keep the decision traceable to the affected parts and inspection records.
BUYER QUESTIONS
Review common questions about first sample approval, lot sampling and nonconforming results. Use them to clarify what must be checked, which records to request, and who decides whether a lot can be released.
No. Set the checks according to the product, drawing and application. A coated element and a finished imaging assembly may require different tests and records.
Define this by characteristic before production. Record the agreed sample size or unit-by-unit requirement and the criteria used to accept the lot.
Identify and hold the affected parts for review. Document the result and agree on the next step, such as retesting, rework, rejection or an authorized concession.
PROJECT INQUIRY
Send your latest drawing, acceptance limits, lot size and reporting requirements. Identify checks required for sample approval and production release, and note any customer procedures that the inspection plan must follow.
Include a model number or the information currently available:
You do not need a complete optical specification to start. Send the information currently available, along with your delivery destination and preferred schedule.